Estimate what you cannot measure

Use this to choose an estimation method for a gap in your emissions data, and to record the estimate so your assurer accepts it.

Written by Misha Cajic

Use this to choose an estimation method for a gap in your emissions data, and to record the estimate so your assurer accepts it.

Every reporting period has missing data. Assurers accept estimates. They do not accept undocumented ones. An estimate with a stated method and assumptions passes. A number with no explanation does not.

When should I estimate rather than chase the data?

Chase the data when it exists and someone can send it. Estimate when it does not exist, or when the effort to get it is out of proportion to its size.

Decide per gap, and record which you chose.

Which estimation method should I use?

This table shows the usual estimation method for each kind of data gap.

Gap

Method

Some months missing from a full year

Annualise from the months you have

A site with no meter data

Apply intensity from comparable sites, by floor area or headcount

Employee commuting with partial survey responses

Extrapolate responders to total headcount

A supplier that will not provide data

Spend-based factor

A category with no activity data at all

Spend-based from the ledger

A missing final month before reporting

Use the prior period average and restate once actuals arrive

Use the same estimation method for the same gap each year. A method that changes between years breaks comparability, and any change needs recording.

How do I annualise from partial data?

To annualise a part-year of data, check the missing months first. If you hold nine months of invoices, do not simply multiply by 4/3. Check whether the missing months are seasonal.

For electricity and gas, use the same months from the prior year to weight the estimate. For steady consumption, a straight scale-up is acceptable.

Record in your Basis of Preparation whether you weighted by season or scaled up.

How do I extrapolate survey results?

Where an employee survey covers part of your workforce, apply the average result of respondents to non-respondents.

There is no fixed cut-off for the survey response rate. It is a judgement, so record the response rate and your reasoning. A 60% response rate extrapolated to the whole workforce is reasonable. A 5% response rate is not, and needs a different method.

How do I enter an estimate in Avarni?

Avarni does not calculate estimates for you. Work out the estimate outside Avarni, then load the estimated figure as activity data, the same way as measured data. See Ways to get your data into Avarni.

What should I record for each estimate?

For each estimate, record four things:

  1. What was missing.

  2. The method you used.

  3. The inputs and assumptions.

  4. How confident you are.

This goes into your Basis of Preparation, so your assurer sees the gap and the reasoning together.

Should I replace estimates with real data later?

Yes, an estimate is not permanent. Each year, review which gaps can now be closed with real data.

Where you replace an estimate with actual data, record the change and its effect on the comparative.

Did this answer your question?