Skip to main content

Reuse your NGER figures in your AASB S2 report

Use this article to reuse your National Greenhouse and Energy Reporting (NGER) Scope 1 and 2 figures in your AASB S2 climate report, and to work out the top-up that AASB S2 needs on top of them.

Written by Misha Cajic

Use this article to reuse your National Greenhouse and Energy Reporting (NGER) Scope 1 and 2 figures in your AASB S2 climate report, and to work out the top-up that AASB S2 needs on top of them.

Can you reuse your NGER figures in your AASB S2 report?

Yes, you can reuse your NGER figures in your AASB S2 report for the part of your entity that NGER covers. Which rules apply depends on your reporting period.

  • AASB S2025-1 (December 2025), an amendment to AASB S2, lets you measure the part of your entity that NGER covers with NGER methods and NGER global warming potential (GWP) values.

  • AASB S2025-1 applies to annual periods beginning on or after 1 January 2027. You can apply it earlier, but you must disclose that you have (paragraph C1B, on early application).

  • Before you apply AASB S2025-1, paragraphs 29(a)(ii) and B24 already let you use a method that NGER requires for the part it covers. Use AR6 GWP values, from the IPCC Sixth Assessment Report, for that part (paragraph AusB22.1).

  • In your first AASB S2 year, the first-year relief in paragraph C4(a) also lets you keep the method you used the year before.

  • Disclose the method you used and why you chose it (paragraph B28).

  • If you start to use the relief after an earlier AASB S2 year, adjust the comparative, the prior-year figure you show next to this year's (paragraph C6).

Which consolidation approach applies to the NGER part?

Reusing NGER figures changes your boundary. NGER uses operational control, so the part you reuse follows operational control. This applies whatever approach you chose for the rest of the group.

For example, Bluegum uses financial control, so its 12 utes and 6 stores on operating leases are in Category 8. If Bluegum reused NGER figures, the utes and stores would be in Scope 1 and 2. See the Bluegum table in How the NGER, AASB S2 and GHG Protocol boundaries differ.

The AASB S2 relief for NGER figures applies only inside your AASB S2 reporting entity. It is not settled whether the relief can bring in a facility that your group operates but does not consolidate. For such a facility, use your chosen approach, disclose the judgement, record it in your boundary document and discuss it with your auditor. In the Bluegum example, the Coastline Kayaks factory, a 50% joint venture, stays at 50% in Scope 1 and 2 under financial control.

For how NGER reuse affects your choice of approach, see Equity share, financial control and operational control compared.

What do you check before you reuse NGER figures?

If you reuse NGER figures in your AASB S2 report:

  • State in your Basis of Preparation which part uses NGER figures, that it follows operational control, and why you chose this method (B28).

  • Count each facility once. A facility in your NGER figures must not also appear in Category 8 or Category 15.

  • Remove from your spend-based Scope 3 any contractor services whose fuel is already in an NGER facility total. Otherwise that fuel is counted in Scope 1 and again in Category 1.

  • Check that any NGER estimation shortcuts for small sources are also immaterial under AASB S2.

What is the top-up?

The top-up is everything your AASB S2 report needs that your NGER report does not give you:

  • Scope 3. NGER does not cover it.

  • Operations outside the NGER report. These are overseas operations, entities in your AASB S2 group that are outside the NGER group, and facilities your approach counts but another company operates.

  • A different period. If your financial year does not run from 1 July to 30 June, re-cut the data to your financial year.

  • Scope 2 contract information. AASB S2 requires location-based Scope 2 and information about your contractual instruments, such as renewable electricity certificates.

For example: an NGER report shows 4,200 tCO2e. Add a New Zealand subsidiary at 300 tCO2e and a share of a joint operation, run by the partner, at 150 tCO2e. AASB S2 Scope 1 and 2 is 4,650 tCO2e, before Scope 3.

How to report the NGER part separately in Avarni

  • Avarni has one assessment per financial year. If your financial year is not 1 July to 30 June, filter the Emissions Hub to 1 July to 30 June to get NGER-year figures. Then use Download as Excel.

  • To report the NGER part separately, create a custom field under Settings › Custom Fields, such as "NGER report" with the valid values Yes and No. Set it on each row. Then filter or group by it in the Emissions Hub.

  • Settings › Global Warming Potential holds one version for your whole organisation. It cannot apply NGER values to one part only. See Choose your global warming potential version: AR4, AR5 or AR6.

Did this answer your question?